verse of the day

Showing posts with label flooring. Show all posts
Showing posts with label flooring. Show all posts

Sunday, March 14, 2010

Kitchen Remodel Part 3

Here is Part 3 of The 1829 Farmhouse kitchen project.   This project was started in October 2008 and finished December 2009 (well almost).  Go here for Part 1 and Part 2

So on with the journey...

To recap, the water disaster was actually a cloud with a silver lining in that we HAD to remove the linoleum flooring (boo hoo).  It ONLY took 6 months to get to the ripping up of the floor, but for now I'm getting ahead of myself.  After the water mess was cleaned & dried up (took about 3 days with commercial dryers & fans), we were back on track.  

Our contractor, Ed, returned the next week and worked on installing the following: 

  • Ikea countertop (drove 3 hrs and back in one day as it was cheaper than shipping)
  • E-granite composition sink (ebay store)
  • Price Pfister orb faucet/sprayer combo (ebay store:faucets.com) (a bargain at $28 and it was new!)
  • wood beadboard (Home Depot)
He also removed part of an upper cupboard so that we could move the fridge over into the kitchen area to complete that wonderful item called the "work triangle".  This really opened up the dining area and the light from the french door to the deck.
   
The image below isn't exactly our layout but its fairly close.  There is a deck door to the immediate left of the stove, sink is centered under the window, fridge is directly across from stove and the countertop shown is how it use to be.  Now the countertop is a straight run with a rolling cabinet to the right of the stove.













Before and After  of the upper cabinets revamping:




Above you see where the Ikea counter is set to be cut to fit and below is the other end of counter.





Here is the kitchen as it was in December 2008.  Still lacking cupboard doors and paint but functional for the holidays. 














Around about April we had our carpenter, Darrin, step in to make the cupboard doors, two drawers and the trash/recycle bin (my fav).  He is an excellent finish carpenter and knows my likes & dislikes...which translates that he's great to work with.  He converted what was 3 deep drawers on each side of sink to a drawer and cupboard on left, and a drawer and trash bin on right.  To make it appealing to the eye, he also made a false drawer front for center cupboard (below sink) that tilts out to hold my scrubbers and sponge.



























Below are the cupboard doors in the raw (before tung oil).  This first pic is a cupboard that was longer and we cut the divider out to make an area for the microwave.  You can see that the beadboard was not finished.  The back wall of the cupboard (you can see through the window) had beadboard applied later as well.  
The glass for the window portion of the door are reclaimed old bubble/wavy window glass.  I had ordered some online and then found I had some old windows in the shed.  Oh well, it worked out since 1 of the panes that I ordered didn't exactly suit the "old" look so I used my own for that opening.



























In July 2009 we (my hubby & crew) removed the 2 layers of linoleum flooring.  He then spent two weeks (of vacation) trying to remove the mastic.  He basically used Goo Gone & Citrus Stripper in large quantities to cut through the yuk.  It did the trick.  We lived with the floor like this until November when we had it refinished.  You can see the Before & After here.

Below you can see that the old white multi-layered paint was finally removed from upper cupboards, base cupboards revamped, beadboard installed & walls painted.  The base cupboards still awaiting their topcoat of black paint..  This pic below was taken during the floor refinishing, thus the fan in window removing stinky smell from room...it was bad!


There was still much to do from the point we were at in the above pic, but we could see the end in sight.  If we learned anything from this remodel, it was how to be patient, steadfast and to not give up!






Tuesday, February 9, 2010

Kitchen Remodel Part 2

As part of a series, here is Part 2 of The 1829 Farmhouse kitchen project.   This project was started in October 2008 and finished December 2009.  This is our journey.

Here is our carpenter removing the ugly retro pink-speckled counters, 
backsplash and end cupboards 

Our carpenter, Ed, had the toughest time pulling out the end base cupboards as they were built onto the subfloor.  He also removed the huge cast iron sink.  We were originally going to have the sink resurfaced but after some advice decided against it.  The metal trim around the edge of the sink must be carefully removed and it doesn't always go back in correctly.  
Not so bad...we were able to get a black e-granite deep & wide (reminds me of a sunday school song) sink to take its place. LOVE it! (stay tuned for those pics)

Here is the kitchen with ugly retro pink-speckled countertop and backsplash removed. 
  (can you hear the clouds parting and the angels singing?)

Th picture above was taken 12 hours before the hot water turn-off valve decided to spring a leak sometime during the night. (the rubber gasket had a pin-size hole in it)  We awoke Sunday morn to smoke alarms going off around 6am.  This was  a bit of a heart thumper to say the least.  We cleared the cobwebs out of our sleepy heads, gathered our thoughts and realized it wasn't a fire but water hissing.   We carefully opened the stairway door to find that our first floor had  been remodeled into a sauna, which wouldn't be so bad if we hadn't needed a kitchen, diningroom & livingroom!  It was like old faithful had taken up residence in our kitchen.

 
Can you see the bucket in lower left corner of pic?  It was filled with water that covered several power tools left by our carpenter.  After the clean-up company came in and dried everything out, they were still working!  Just amazing.


Steam bubbled up paint overhead near the ceiling


Needless, to say, this put our deadline back another week and right before Christmas.

But with ...
"Every adversity, failure, heartache carries with it the seed of an equal or greater benefit."
~Napoleon Hill

The mess (thankfully) was covered by insurance, required that a portion of the hideous vintage linoleum flooring be removed which in turn led to our beautiful wooden floors (that were lying underneath).
This isn't the recommended way of doing things but alas we didn't have any say in this part of the remodel!

So until next post... 



Sunday, December 6, 2009

Sigh....kitchen still in progress

Our kitchen is taking MUCH longer than anticipated and of course the holidays are FAST approaching.  Don't we all work better under PRESSURE! (sure)  I am so sorry for the time lapse in posting.  For this reason,  I thought I'd give you a bit of a glimpse into the progress so far.  It's beginning to look a lot more like a kitchen...just like it's beginning to look a lot like Christmas!  We have some finishing to do on woodwork and then the distressed paint job on lower cupboards.  There may be some things that will HAVE to wait until January. (sigh)  Without further ado, here are some pics....

 Floor before:



Floor after:



Aren't the floors just gorgeous!  Charlie, our local floor re-finisher did an amazing job.

The bottom cupboards have their base coat on them, awaiting the top coat, crackle paint and some distressing.  In the upper photo, there is a piece of wood (on right) lying across the ladder which are the "feet" to the bottom cupboards so they look like furniture.  Our carpenter friend, Darrin, made that along with all the cupboard doors (soon to be installed), and trash bin pull-out (my fav).
So stay tuned for the full reveal...coming soon to this blog!


Thursday, November 5, 2009

Kitchen In Progress


 We are in the midst of finishing our kitchen remodel, so my blog has been neglected the last few days.  As you can see below, my kitchen was stuck somewhere in the 1940's with pink speckled laminate counters and backsplash.  Last fall (mid October '08), I started removing the paint from the cabinetry and woodwork and uncovered some beautiful patina-ed pine.  We had many changes made before Christmas '08 (cupboards reconfigured with new doors, new sink, faucet, countertop, & bead-board installed), then put the kitchen on hold due to the holidays, kids coming home from college and life in general.  We got back on track in July when we finally pulled up the old linoleum to uncover 5 inch wide pine flooring in nice shape but dark and dingy. It has been a long process, but will be worth all the effort and $ we saved by doing most of the work ourselves.  The reveal should be the week after Thanksgiving, so stay tuned!

 

 

This has been my best friend during this renovation.
It's a bit on the pricey side, but it has no odor or nasty chemicals and works very well.
Most paint stores carry this or check out their website to find a store near you.

 
Back to Nature Multi Strip

 

LinkWithin

Related Posts with Thumbnails
Blogging tips